Decision log

Everything agreed, in order. Corrections append a revision — the original is always kept.

Confirm north elevation window sizesedited · rev 2

North-facing windows confirmed at 1200×1500mm per revised elevation B. Supersedes the 1000×1400 shown on the original permit set.

Logged · Dana Okafor (Owner)Aug 20, 2026 · 08:30 AM
Revision history (2)
Rev 2 (current)Aug 20, 2026 · 08:30 AM
North-facing windows confirmed at 1200×1500mm per revised elevation B. Supersedes the 1000×1400 shown on the original permit set.
By · Dana Okafor (Owner)
Rev 1Aug 18, 2026 · 02:05 PM
North-facing windows confirmed at 1000×1400mm per original permit set.
By · Dana Okafor (Owner)
Foundation slab pour scheduled

Slab pour agreed for Aug 15 pending inspection sign-off. Ridgeline to confirm concrete supplier 48h prior.

Logged · Ridgeline Builders (GC)Aug 13, 2026 · 11:20 AM
Kitchen layout locked (galley)

Galley layout locked; island dropped to preserve the walkway width Dana asked for. Appliance spec unchanged.

Logged · Dana Okafor (Owner)Aug 12, 2026 · 04:45 PM